- Home
- Projects
- Johnstown Water System
Johnstown South Water Tank distribution system
Johnstown, Colorado
Project description
SMH West furnished and installed the water distribution system tied to construction of the Town of Johnstown's new South Water Tank.
- About 37,300 LF of 16 inch C905 (DR 18) PVC pipeline
- 12 inch and 16 inch fittings and isolation valves
- 40 fire hydrants and 2 air relief valves
- One HDD river crossing
- Four bored canal crossings
- Two tunneled railroad crossings
- Two county road crossings
- Pipe restraints and related work

